color | art. no. | capacity | quantity per box |
light grey | 15260 | 0,8l + 0,2l | 6 |
High-quality 2-component epoxy primer with anti-corrosion additives designed specifically for use under Rangers 2K polyurethane protective coating. It perfectly protects steel surfaces from corrosion in the automotive repair process, while strengthening and prolonging the anti-corrosive effect of the Rangers protective coating. At high dilution, it can be applied using wet-on-wet technique.
Rangers Anticorrosive Epoxy Primer 4:1 can be applied over:
Good surface preparation is essential to achieve the best repair results.
degrease
mixing proportions
4 : 1 + 15%
4 : 1 + 25%
4 : 1 + 50%
spray viscosity
4 : 1 + 15%
4 : 1 + 25%
4 : 1 + 50%
pot life
approx. 3h at 20°C
number of layers
2 ÷ 3 layers
HVLP / RP
Ø 1.5 ÷ 2.0 mm
between layers: 5 ÷ 10 min.
before baking: about 10 min.
hardening time
8 h / 20°C
45 minutes/ 60°C
P360 ÷ P500
P600 ÷ P1000
For car repairs as a filling primer or isolation primer for sending or wet wet technique.
Primer : 4
Hardener : 1
Thinner :
– 15% as filling primer
– 25% as grounding primer
– 50% as wet on wet
Stir thoroughly until achieving homogenous mixture.
55 ÷ 60 seconds at 20°C for the filling version (at 15% thinner)
35 ÷ 40 seconds at 20°C for the grounding version (at 25% thinner)
18 ÷ 20 seconds at 20°C for wet on wet version (at 50% thinner)
about 3 hours at 20°C
2 ÷ 3 layers
Recommended layer thickness:
• isolation primer: 50÷70µm dry film.
• filling primer, for sanding: 200÷250µm dry film.
RP gun parameters
Nozzle: 1,6÷2,0 mm; Pressure: 2,0-2,2 bar.
HVLP gun parameters
Nozzle: 1,5÷1,9 mm; Inlet pressure: 2,0 bar.
between layers: 5-10 minutes
before baking: approx. 10 minutes
before applying clearcoat (wet on wet): 60-120 minutes
Evaporating time depends on temperature and layer thickness
about 8 hours at 20°C (depending on the layer thickness)
about 45 minutes at 60°C (depending on the layer thickness)
Temperature lower than 20°C is extending hardening time.
10÷15 minutes under short wave for thickness 150÷200µm
Do not exceed 60°C.
Use as recommended by the equipment manufacturer.
Wait about 10 minutes before starting the heater drying.
Grinding Machine: P360÷P500.
Hand Sanding: P280÷P320.
Grinding Machine: P600÷P1000.
Hand sanding: P800÷P1000.
Wet on wet does not require sanding!
2-component Anticorrosive epoxy primer Rangers can be applied over:
Caution: To maintain safety, always follow the instructions given in the MSDS for the products.